We look forward to your contact with us
Remove debris such as iron filings, rust, welding slag, sand and oil stains left inside the system during equipment pipeline installation, as well as debris left over during construction, to ensure safe operation in the future.
TEDA Financial Plaza, Binhai New Area, Tianjin
Tel:+ 022-66208896
Tel:+ 18622909087
Mailbox:ingcoair@163.com